This 4000
square foot addition doubled the size of the Mount Morris Public
Library. The expanded and remodeled library features an enlarged
childrens section with a puppet stage / story area. A new
reading area centered on a fireplace gives adult patrons a comfortable
place to relax with a good book. We also added a public meeting
room that can be used outside of normal library hours without
compromising library security.
The construction
was phased to minimize the impact the librarys day-to-day
operations. The project phasing plan developed by BCA enabled
the library to operate during nearly the entire construction process.
When construction of the addition was complete, the library moved
into the addition while the original library was remodeled. This
project was completed in winter of 2002.
Careful attention
to detailing and an appropriate selection of materials will result
in an addition that is exciting yet still works within the architectural
context of the original library.
|